HoSt AD plant - Villemereuil France

Organic residues & manure biogas plant in Villemereuil, France

The biogas facility at Villemeruil converts organic residues and manure into renewable energy. The generated biomethane is injected into the grid - strengthening the available energy mix in France.
HoSt manure biogas plant - Villemereuil France

Turnkey biogas system

The biogas plant in Villemereuil, France is a turnkey biogas plant. The biogas system is equipped with two digesters, one after digester, a heat recovery unit, two solid feeders, a liquid storage tank, digestate treatment technology, and biogas upgrading technology. The biogas system produces more than three million Nm3 of biomethane per year.

“We chose HoSt technology first and foremost for the safety and assurance of production under all circumstances, but also because of the biogas plant energy performance and operating comfort even during maintenance periods”
Didier Boyau, manager Villemereuil Biogaz

Boosting biomethane production in France

Lead time
0 months
Waste utilized
0 tons per year
Biomethane produced
0 million Nm3 per year

The turnkey biogas plant in Villemereuil produces biomethane from biogas from the anaerobic digestion of manure. The generated biomethane is injected into the grid and is equivalent to the gas supply of more than 2,000 French households.

HoSt biogas plant - Villemereuil, France
Lead time
0 months
Waste utilized
0 tons per year
Biomethane produced
0 million Nm3 per year

Technical highlights

Input / feedstock type
Biogas capacity
Digester
After-digster
Pre-storage
Digestate treatment
Solid feeding input
Heat recovery
Biomethane capacity
Methane concentration biogas
Methane concentration biomethane
Biogas upgrading efficiency
Specifications
Agriculteral waste, silage, solid manure, straw, beets
700 Nm3/h
Two digester of 2655 m3
2655 m3
Two silos of 50 m3
Screw press separator
Two mixing dosing bins of 80 M3
External heat recovery
387 Nm3/h
54%
97%
99,5%

Project characteristics

  • Commissioning occured after only 11 months of construction
  • Turnkey biogas plant
  • External heat exchanger technology